Site search
sponsored by
The environmental study for a controversial proposed development on Lake Tahoe's North Shore was released by the Tahoe Regional Planning Agency Nov. 6.
The document details the effects Boulder Bay, a proposed resort in Crystal Bay on the Tahoe Biltmore and former Tahoe Mariner sites, could have on its surrounding environment including air quality, water quality, traffic, noise and more.
Below are links to PDF files of the document. Because of the size of the document, it needed to be divided into chapters. To read each chapter, click the link that will begin to download the information.
The document details the effects Boulder Bay, a proposed resort in Crystal Bay on the Tahoe Biltmore and former Tahoe Mariner sites, could have on its surrounding environment including air quality, water quality, traffic, noise and more.
Below are links to PDF files of the document. Because of the size of the document, it needed to be divided into chapters. To read each chapter, click the link that will begin to download the information.
Cover
Contents
Summary
Introduction
Project Alternative Descriptions
Plan Consistency
Environmental Analysis
Land Use
Geology
Hydro Water Quality
Biological Resources
Scenic with figures
Recreation
Cultural Resources
Transportation with figures
Air Quality
Noise
Socioeconomios
Public Services Utilities
Mandated Analysis
Mitigation Monitoring Plan
Contacts Preparers
Notice of Preparation
Comment Summary and Letters
Boulder Bay Meeting List
Commodity Verification Backup
Circulation Plan
Alternative Transportation Plan
Storm Water Management Plan
Nevada Tahoe Regional Planning Agency Approval Letter
Soils/Hydrologic Scoping Report
Arborist Report
Tree Recommendation Protection Measures
Sierra Park Amendment Memo
Geo Tech Report
Landscape Plan
Existing Conditions Storm Water Quality Report
Total Maximum Daily Load Executive Summary
Total Maximum Daily Load Executive Plan
Species List
2009 Biological Surveys
Proposed Height Amendment
Cultural Resources Study
Traffic and Parking Calculations
Air Quality Appendix
Noise Appendix
Contents
Summary
Introduction
Project Alternative Descriptions
Plan Consistency
Environmental Analysis
Land Use
Geology
Hydro Water Quality
Biological Resources
Scenic with figures
Recreation
Cultural Resources
Transportation with figures
Air Quality
Noise
Socioeconomios
Public Services Utilities
Mandated Analysis
Mitigation Monitoring Plan
Contacts Preparers
Notice of Preparation
Comment Summary and Letters
Boulder Bay Meeting List
Commodity Verification Backup
Circulation Plan
Alternative Transportation Plan
Storm Water Management Plan
Nevada Tahoe Regional Planning Agency Approval Letter
Soils/Hydrologic Scoping Report
Arborist Report
Tree Recommendation Protection Measures
Sierra Park Amendment Memo
Geo Tech Report
Landscape Plan
Existing Conditions Storm Water Quality Report
Total Maximum Daily Load Executive Summary
Total Maximum Daily Load Executive Plan
Species List
2009 Biological Surveys
Proposed Height Amendment
Cultural Resources Study
Traffic and Parking Calculations
Air Quality Appendix
Noise Appendix


Home
News












